Ground Mounting installation instruction for SPC-GA20-4H-CW
Installation steps for ground mounts SPC-GA20-4H-CW Step 1: Pre-assembly and installation of purlin When shipping, the factory has pre-assembled the purlin, jackets, columns, and grounding screws with bolts. After the bracket arrives on site, only need to open the pre-assembly, rotate the square tube in the direction on the drawing, and then remove the pre-assembled…